Refurbishment and upgrade to existing RSL Club, completion over eight stages to improve flexibility for the club’s gaming requirements.
Refurbishment of existing RSL Club with the introduction of underfloor air-conditioning to associated areas – 2,100 m2
BuilderMPA Projects Pty LtdPurpose & SizeRefurbishment of existing RSL Club with the introduction of underfloor air-conditioning to associated areas – 2,100 m2DurationApprox 2 yearsCompleted2018
Installation of New Steel Cementitious Ultrafix stringerless system with a 9.0kN loading at a combined 120 and 500mm FFH, with S1/S2 and S5/S6 pedestals.
Product Code: SC-9.0-UF
The club refurbishment will allow for open planned flexibility for relocation of gaming equipment. There will be a combination of different floor requirements introduced for the installation of under floor air-conditioning to associated areas, in order to meet the current Green Star and Club requirements.
The floor being a 9.0kN panel will provide added strength for equipment to be moved freely without the requirement for added protection.