The University of Technology’s Information, Technology and Engineering Building has been designed to create an open, learning environment for students of the faculty. ASP Access Floors worked in conjunction with builder Lend Lease and architect Denton Corker Marshall to provide a superior raised access flooring solution across general office, learning and breakout areas. The access flooring spans approximately 22,500m2 over 14 levels. It creates a solution that allows the university maximum flexibility with a readily accessible underfloor space to run electrical, mechanical and communications cabling.
ClientUniversity of TechnologyBuilderLend LeasePurpose & SizeUniversity: 22,300m²Duration2 YearsCompletedJune 2014
Product Code: SC-64-4.5-AT
The specification called for an under floor air distribution system where each zone completed was to be tested to comply with specific air leakage rates. The ASP Access Floors Air Tight System complete with its clip on air tight stringer and accessories, such as baffling and bridging stringers, ensured that the flooring system achieved the required air leakage rates.