275 Kent Street, Sydney

Commercial office space across 30 plus floors adjacent to the Barangaroo Precinct. The building upgrade is required in order to meet the current 5 Star Green Star requirements.

BuilderMPA Projects Pty LtdPurpose & SizeCommercial Tower Refurbishment: 35,000 m2Duration2 yearsCompletedApprox 2018


Access Floor System Used:

Reuse existing T3 & T4 ASP Floor System

Installation of New Steel Cementitious Ultrafix stringerless system with a 3.0Kn loading at 150mm FFH

Product Code: SC-3.0-UF

Installation of Steel Cementitious HPL Rigid Grid System with a 4.5kN loading at 1500mm FFH

Product Code: SC-4.5-RG-HPL

Project Features and Highlights:

The Tower Refurbishment will be a combination of executive and standard open plan offices. ASP Access Floors met their Green Star requirements by having the appropriate sealants and adhesives being used in this project, in conjunction with low formaldehyde based laminate products to the HPL Floor within their Comms Rooms.

In conclusion ASP Access floors were able to provide our Environmental Product Declaration (EPD) of our access floor system. This in turn was a huge bonus for MPA to meet their Green Star requirements. This was the first project ASP were able to offer our EPD Declaration to our clients.