Project Size |
30,000 m² |
|
Value |
$ 2.7 Million |
|
Builder |
Watpac |
|
Program |
Start Date: August 2008 Handover Date: October 2009 |
|
Application |
RAF 01 – CF Air Tight System FAF 02 – CF HPL Rigid Grid system |
|
Project Synopsis Provide an air tight access floor and air highway for the purpose of running cooling and heating throughout the building. Scope of work Provide an air tight access floor and air highway throughout the majority of the building. Installation of bridging stringers to bridge over services, at a maximum span of 1200mm. Installation of heavy grade data/comms room access floor for smaller communication room throughout the building. |
|