Project Size |
30,000 m² |
|
Value |
$ 2.7 Million |
|
Builder |
Probuild |
|
Program |
Start Date: August 2008 Handover Date: October 2009 |
|
Application |
RAF 01 – CF Bare Panel FAF 02 – CF HPL Rigid Grid system FFH 300mm |
|
Project Synopsis Provide an access floor for the purpose of running cooling and heating throughout the general office area. As well as the installation of insulated plenum ducts. Scope of work Provide a standard bare access flooring ultra fix system to entire general office area, and create insulated plenum ducts for the purpose of distributing the hot/cool air through the building. Installation of heavy grade data/comms room access floor for smaller communication room throughout the building. |
|